Are you preparing your garden for next season? Do you need to dig a
pool or level the terrain of the garden? We carry out
earthworks that we do for customers in Prague and around 60 km. Excavation work is carried out by a mini-digger, all earth is weighed using a container-type container wagon.
Price list of the pavement pavement
Making only work - Prizes for self-employment without delivery of materialwork | price per m 2 |
---|
Comparison of floors The price includes: preparation of the subsoil, compaction and straightening of the substrate. All without material | 150 CZK |
Installation of interlocking pavement Included in the price is handling shredder 4/8 and its comparison, laying, compaction and sandblasting. Everything is made of material. | 350 CZK |
Laying of road curbs The price includes the laying of curbs. All without material. | 150 CZK |
Laying Linea curbs, etc. The price includes the laying of curbs. All without material. | 110 CZK |
Laying of park curbs The price includes the laying of curbs. All without material. | 90 CZK |
Laying palisades with a height of 40cm The price includes palisades. All without material. | 200 CZK |
Laying palisades with a height of 60cm The price includes palisades. All without material. | 250 CZK |
Laying palisades with a height of 80cm The price includes palisades. All without material. | 300 CZK |
LVR - ancillary budget costsEarthworks - mini excavator, price according to actual hours. | 850 CZK |
Manual handouts, price according to actual hours. | 290 CZK |
Folding into a mosaic according to the difficulty | 850 CZK |
CAT track excavator 3,7 t *, price according to actual hours. | 600 CZK |
Container 3.5 m 3 (transport: 23 CZK / km), price according to actual hours. | 500 CZK |
Land transport container 3,5m 3 + transport | 1 200 CZK |
Dumping of container 3.5m 3 + transport | 1800 CZK |
* The track excavator is always transported by means of a containerComment:Items with only the estimate are billed based on the hours actually worked. A reduced VAT rate can be used in connection with § 48 VAT rates for residential construction.